Table 6. Effect of Union Status on Total Violations per 1000 Onsite Inspection Hours per Mine-Quarter (Full Version: All Covariates)
Specification Baseline (Hours Worked) Employees Tonnage
Model
Public Fields Only
Confidential Fields
Public Fields Only
Confidential Fields
Public Fields Only
Confidential Fields
Mine/Controller Size Units:
100 Quarterly FTEs
100 Quarterly FTEs
100 Employees
100 Employees
Millions of Tons
Millions of Tons
Union -31.363*** -26.716** -21.789** -23.297** -17.609** -17.683
(10.40) (11.28) (8.49) (10.93) (8.76) (11.33)
Union X Mine Size 9.307** 7.315 7.081 6.324 19.759 16.175
(4.63) (5.24) (5.67) (7.42) (26.08) (31.75)
Mine Size -12.422** -5.180 -4.407 1.526 13.967 27.636
(5.62) (6.15) (6.46) (8.60) (22.66) (27.66)
Log of Controller Size -1.915 -2.581 -6.278*** -6.789** -6.843*** -6.885***
(2.21) (2.44) (1.81) (2.70) (1.61) (2.33)
Lost-Day Injuries in Prev. Year 0.397 0.785 -0.036 0.114 -0.245 0.056
(0.64) (0.74) (0.61) (0.71) (0.62) (0.73)
Penalty Pts. in Prev. Year 2.834*** 1.749*** 2.392*** 1.476*** 2.151*** 1.465***
(0.53) (0.49) (0.52) (0.53) (0.50) (0.48)
Mine Age 0.138 0.257 0.141 0.172 0.095 0.140
(0.39) (0.49) (0.38) (0.48) (0.37) (0.47)
Productivity -1.777 -0.853 -0.893 -0.499 -0.843 -0.787
(1.11) (1.27) (1.03) (1.29) (0.85) (1.07)
NIOSH Longwall Dummy 35.119*   31.775   19.895  
(19.71)   (19.90)   (20.78)  
Number of Coal Beds   -3.271   -0.148   2.081
  (24.04)   (24.32)   (24.31)
Avg. Coal Bed Thickness (yds.)   -2.955   0.008   0.137
  (8.83)   (8.45)   (8.39)
Subsidiary Indicator   6.095   13.569   14.558
  (10.97)   (10.89)   (10.66)
Pct. Captive Production   17.909   19.168   18.492
  (20.41)   (20.97)   (21.23)
Recoverable Reserves   -0.000   -0.000   -0.000
  (0.00)   (0.00)   (0.00)
Pct. Continuous Mining Method   -0.233   -0.071   -0.004
  (0.15)   (0.13)   (0.13)
Pct. Conventional Mining Method   -0.100   0.057   0.110
  (0.16)   (0.15)   (0.15)
Pct. Longwall Mining Method   -0.221   -0.055   -0.125
  (0.37)   (0.39)   (0.40)
Pct. Shortwall Mining Method   -0.396   -0.178   -0.096
  (1.15)   (1.17)   (1.19)
Constant 61.483*** 164.952*** 116.283*** 102.028*** 109.349*** 94.458**
(18.16) (37.81) (20.54) (38.10) (19.23) (38.60)
Subunit Dummies Yes Yes Yes Yes Yes Yes
Quarter Dummies Yes Yes Yes Yes Yes Yes
District Dummies Yes Yes Yes Yes Yes Yes
Observations 23,273 16,694 22,601 16,230 22,601 16,230
# of Union Mines / # of Total Mines 227 / 1,519 151 / 1,114 227 / 1,514 151 / 1,109 227 / 1,514 151 / 1,109
R2 0.023 0.028 0.029 0.030 0.030 0.031
Regression Date/Time 12/2/11 16:53 12/2/11 16:53 12/2/11 16:53 12/2/11 16:53 12/2/11 16:53 12/2/11 16:53

Definitions: Significance Levels: *** 1%, ** 5%, * 10%. FTE is defined as 2,000 man-hours.

Models: All models are ordinary least squares regressions; standard errors (shown in parentheses) are clustered at the mine level. The unit of analysis for all models is the mine-quarter.

Sample: public sample is: (1==1) (underground_mine==1) (coal_dummy==1) (bituminous==1) (active==1) (first_qtr_of_production==0) inrange(year, 1995, 2009). private sample is: (1==1) (underground_mine==1) (coal_dummy==1) (bituminous==1) (active==1) (first_qtr_of_production==0) inrange(year, 1998, 2009).

Independent Variables: All models include the following regressors: union dummy, union-size interaction term, mine size measure (defined as specified in column headers), logged controller size measure (defined as specified in column headers), mine age, productivity, number of lost-work injuries (in hundreds) in the previous four quarters, total penalty points (in thousands) in the previous four quarters, a constant term, dummies indicating presence of each type of mine subunit, quarter dummies, and district dummies. In addition: "Public Fields Only" models include the NIOSH longwall dummy; and "Confidential Fields" models include number of coal beds, mean coal bed thickness (in yards), subsidiary indicator, captive production as a percentage of total production, recoverable coal reserves, and mining method percentages.

Dependent Variable: Total Violations per 1000 Onsite Inspection Hours per mine-quarter.